Industrial safety examination of a boiler house building


What is an industrial safety examination of a boiler room?

An industrial safety examination of a boiler house building is an assessment of the heating, production and production-heating complex for the production of steam and hot water for compliance with the requirements and standards of industrial safety established by law and regulations.
The industrial safety examination of a boiler house is carried out by an expert organization licensed by Rostechnadzor for this type of activity, as well as a staff of specialists trained and certified in industrial safety programs. Expert activities are regulated by the Federal norms and rules “Rules for conducting industrial safety examinations”.

The industrial safety examination of the boiler house, in accordance with the current legislation “On the safety of hazardous production facilities,” is a mandatory procedure necessary for the organization and operation of this complex.

Goals of the examination of hazardous production facilities of a boiler room

  1. Establishing the completeness and reliability of the documentation necessary for the operation of the boiler room;
  2. Determination of the technical condition of the boiler house building and equipment operating under excess pressure;
  3. Determination of the technical condition of pipelines used by the boiler room;
  4. Comprehensive inspection of the facility for compliance with safety requirements;
  5. Increasing the level of protection of people and the environment from accidents associated with the operation of the boiler house under inspection.

Documents found on the topic “equipment commissioning certificate”

  1. Certificate of acceptance and transfer of equipment . Certificate of commissioning of equipment Documents of the enterprise's office work → Certificate of acceptance and transfer of equipment.
    Certificate of commissioning of equipment, acceptance certificate
  2. Act input equipment V exploitation
    Enterprise records management documents → Equipment commissioning certificate

    act No. of commissioning of equipment " " city commission consisting of: chairman: members of the committee ...

  3. Power of attorney for input V exploitation residential building
    Powers of attorney: samples of completion → Power of attorney for commissioning of a residential building

    ... information on the contents of title documents and other documents, certificates f7, f9, conclude and sign contracts, sign acceptance certificates receive technical specifications, represent my interests on the issue of...

  4. Act delivery and acceptance equipment, components and technical documentation, taking into account comments about incompleteness or malfunction equipment (annex to the transfer agreement equipment for free use)
    Agreement for free use → Acceptance certificate for equipment, components and technical documentation, taking into account comments about incompleteness or malfunction of equipment (appendix to the agreement for transfer of equipment for free use)

    act No. of delivery and acceptance of materials and technical documentation, Appendix No. 2 to the contract for the performance of works and services No. ...

  5. Act transfers equipment, components and technical documentation (annex to the transfer agreement equipment for free use)
    Agreement for free use → Certificate of transfer of equipment, components and technical documentation (annex to the agreement for the transfer of equipment for free use)

    Act No. of the transfer of equipment , components and technical documentation Appendix No. to the agreement on the transfer of equipment ...

  6. Complaint against the management organization due to inadequate technical exploitation engineering equipment entrance
    Statements of claim, complaints, petitions, complaints → Complaint against the management organization in connection with improper technical operation of the entrance engineering equipment

    ...the society of our home. control the quality of seasonal inspections and inform us on the basis of Art. 165 housing complex of the Russian Federation with certificates of the technical condition of the building. monitor the actions of the management company’s employees to eliminate violations in…

  7. Agreement for input V exploitation, maintenance and repair of computer and other equipment during the warranty and post-warranty period between the repair company and the consumer (Resolution of the USSR State Arbitration Court of October 22, 1987 No. 21)
    Agreement for the provision of services, works → Agreement for commissioning, maintenance and repair of computer and other equipment during the warranty and post-warranty period between the repair company and the consumer (Resolution of the USSR State Arbitration Court of October 22, 1987 No. 21)

    ...ki and provides it to the contractor for making records of the work performed. Entries in the journal are taken into account when drawing up reports of non-fulfillment or poor quality work. 1.6. When concluding a contract, the parties may agree on additional...

  8. Act about identified defects equipment (Unified form N OS-16)
    Enterprise records management documents → Report on identified equipment defects (Unified Form N OS-16)

    The document “ Act on identified equipment (unified form n os-16)” in word format can be obtained from the link “download...

  9. Act about admission (admission) equipment (Unified form N OS-14)
    Enterprise records management documents → Certificate of acceptance (receipt) of equipment (Unified Form N OS-14)

    The document “ Act of acceptance (receipt) of equipment (unified form n os-14)” in excel format can be obtained from the link “sk...

  10. Agreement for input V exploitation, maintenance and repair of computer and other equipment between the repair company and the manufacturer (approved by the State Arbitration Court of the USSR dated October 12, 1983 No. 22 (as amended by No. 10 of September 10, 1987, No. 2 of July 6, 1988, and from
    Agreement for the supply of goods, products → Agreement for commissioning, maintenance and repair of computer and other equipment between a repair company and the manufacturer (approved by the State Arbitration Court of the USSR dated October 12, 1983 No. 22 (as amended by September 10, 1987 No. 13, dated July 6, 1988, No. 2 and dated

    … ovleniya, if the established warranty period has not expired . The beginning of the warranty period is calculated from the date of signing the equipment acceptance certificate 1.3….

  11. Sample. Act about identified defects equipment. Form No. m-17
    Agreement for the supply of goods and products → Sample. Report on identified equipment defects. Form No. m-17

    form no. m-17 was approved by the resolution of the State Statistics Committee of the USSR dated December 28, 1989 no. 241 +-+ code for okud +-+ act no. about identified defects in equipment “” 20, location of the equipment (city, village, etc.) enterprise...

  12. Act about acceptance and transfer equipment for installation (Unified form N OS-15)
    Enterprise records management documents → Certificate of acceptance and transfer of equipment for installation (Unified Form N OS-15)

    The document “ Act of acceptance and transfer of equipment for installation (unified form n os-15)” in excel format can be obtained from the link “...

  13. Act acceptance and transfer equipment in installation. Form No. m-16 (Resolution of the USSR State Statistics Committee dated December 28, 1989 No. 241)
    Agreement for the provision of services and works → Certificate of acceptance and transfer of equipment for installation. Form No. m-16 (Resolution of the USSR State Statistics Committee dated December 28, 1989 No. 241)

    Form No. M-16 was approved by Decree of the State Statistics Committee of the USSR dated December 28, 1989 No. 241 +-+ code for okud +-+ certificate +-+ handover number date code type equipment warehouse for installation document drawing up the operation +-+-+-+-+- + -+…

  14. Act about delivery to exploitation temporary (non-title) structure (Unified form N KS-8)
    Enterprise records management documents → Certificate of commissioning of a temporary (non-title) structure (Unified Form N KS-8)

    ... construction agreement (contract) number ...

  15. Sample. Act car valuations, equipment and other fixed assets (appendix to the agreement on the procedure for using federal property assigned to a state educational institution with the right of operational management) (pi
    Accounting statements, accounting → Sample. Certificate of valuation of machinery, equipment and other fixed assets (appendix to the agreement on the procedure for using federal property assigned to a state educational institution with the right of operational management) (pi

    ... federal property assigned to a state educational institution with the right of operational management, an act of assessing the value of machinery, equipment and other fixed assets for “” 20, state institution +-+ no.in...

Cost of industrial safety examination of a boiler house building

Name of serviceMoscow Saint Petersburg Regions
Examination of the boiler house buildingfrom 60,000 rub.from 50,000 rub.from 50,000 rub.
Examination of hydraulic fracturing, gas equipmentfrom 60,000 rub.from 50,000 rub.from 50,000 rub.
Tank examinationfrom 50,000 rub.from 40,000 rub.from 40,000 rub.
Examination of pressure vesselsfrom 35,000 rub.from 30,000 rub.from 30,000 rub.
Examination of boiler room pipelinesfrom 45,000 rub.from 40,000 rub.from 40,000 rub.

Are you looking for a reliable company to register a hazardous production facility? We will help you obtain a Rostechnadzor certificate and information characterizing the hazardous production facility. We also help you obtain a duplicate passport of technical devices and equipment.

Permission for admission to operation of TPP

Obtaining an admission permit, as well as the operating rules for power plants, apply to all thermal power plants (boiler houses, heating networks, heat consumption systems) regardless of their power (heat load).

Our experts will prepare a complete package of documents to obtain permission from Rostechnadzor to put a thermal power plant into permanent operation. Services are provided on the basis of clause 2.4. Rules for the technical operation of thermal power plants (approved by Order of the Ministry of Energy of the Russian Federation dated March 24, 2003 N 115) in accordance with Order of Rostekhnadzor dated 04/07/2008 N 212 “On approval of the Procedure for organizing work on issuing permits for admission to operation of power plants.”


Our company provides services to legal entities and individual entrepreneurs registered in Moscow and the Moscow region in obtaining permission from Rostekhnadzor for admission to operation of thermal power plants of boiler houses and heating networks.

What are our services? Our experts:

  • will develop operational technical documentation for the boiler room;
  • will submit a package of documents to obtain permission to operate the TPP to Rostechnadzor;
  • will provide support for documents in Rostechnadzor;
  • will receive and hand over to you a completed permit for admission to operation of the TPP.

What is your involvement? Customer:

  • provides us with initial data for developing documentation
  • puts his signature and seal on the prepared documents;
  • issues a power of attorney for our specialist.

List of documents for permission to operate:

BOILER ROOM THERMAL POWER INSTALLATIONS AND HEATING NETWORKS
Conclusion of an industrial safety examination and its approval by Rostekhnadzor authorities (when identifying a boiler house as a hazardous production facility) Conclusions of the industrial safety examination and its approval by Rostechnadzor authorities (when identifying thermal power plants and heating networks as a hazardous production facility)
Document for special water use Documents for registration of the heating network with Rostekhnadzor authorities or with the organization that owns the network
Permission to use technical devices at a hazardous production facility Permission to use technical devices (equipment of thermal power plants, heating points and heating networks, a section of the heating network, systems, instruments and means of emergency protection, alarm and control used in the operation of the specified equipment) in the presence of identifying signs of danger
Passports of buildings (structures) and power plants Passports of pipelines and thermal power plants
Certificates for equipment (according to the approved list of products subject to mandatory certification) Certificates for pipelines, fittings and thermal power plants (according to the approved list of products subject to mandatory certification)
Technical conditions for connecting thermal power plants and a certificate of compliance with technical conditions Technical conditions for connecting thermal power plants
Interim certificates of completed work Certificate of compliance with technical conditions
The act of delimiting the balance sheet and operational responsibilities of the parties The act of delimiting the balance sheet and operational responsibilities of the parties
Results of technical examination of industrial chimneys and power plants Technical inspection documents
Acceptance certificate by the working commission or acceptance certificate between the installation organization and the customer Acceptance certificate by the working commission or acceptance certificate between the construction (installation) organization and the customer
Technical report on testing (measurements), including non-destructive testing methods Technical reports on the tests (measurements) carried out, including a report on thermal tests of heating systems with determination of the thermal insulation properties of enclosing structures and the heat storage capacity of buildings
Permission to operate electrical installations Permit for admission to operation of electrical installations (for heating points, electrically driven fittings, chambers and passage ducts with lighting and ventilation systems)
Permission for admission to operation of a thermal energy metering unit at a heat source
Certificate of comprehensive testing of thermal power plants Certificate of comprehensive testing of thermal power plants
Acceptance certificate for gas pipelines and gas-using installations for comprehensive testing (commissioning)
Technical device passport (boiler, pipeline, pressure vessel)
Regulatory documents on organizing the safe operation of thermal power plants Regulatory documents on organizing the safe operation of thermal power plants
An extract from the knowledge testing journal or copies of knowledge testing protocols of persons responsible for the good condition and safe operation of thermal power plants, and their deputies, thermal power personnel An extract from the knowledge testing journal or copies of knowledge testing protocols of persons responsible for the good condition and safe operation of thermal power plants, and their deputies, thermal power personnel
As-built diagrams of pipelines and shut-off valves As-built diagrams of pipelines and shut-off valves
Job descriptions, occupational health and safety instructions Job descriptions, occupational health and safety instructions
A set of current operating instructions for power plants, buildings and structures Set of current operating instructions
List of technical documentation approved by the technical manager
Approved program for warming up and commissioning of the boiler room (boiler) Approved program for warming up and commissioning of a thermal power plant, heating network
List of available protective equipment, fire extinguishing equipment and medical assistance List of available protective equipment, fire extinguishing equipment and medical assistance

Depending on the type of thermal power plant (heating networks, boiler room), our specialists draw up the necessary operational logs and schedules in accordance with the requirements of PTETE.

List of operational logs

  • Operational (shift) journal;
  • Order journal;
  • Staff briefing log;
  • Knowledge Test Journal;
  • Logbook of personal protective equipment;
  • Logbook for recording defects and problems with boiler room equipment;
  • Journal of work accounting for work permits for high-risk work;
  • Logbook for emergency and fire drills;
  • Instrumentation and control equipment condition log;
  • Log of walk-through and inspection of heating networks, thermal chambers and thermal wells;
  • Inspection log of the main and auxiliary equipment of the boiler room;
  • Monthly chimney inspection log;
  • Inspection log of the boiler room building and extensions.

List of charts

  • Security automation maintenance schedule;
  • Maintenance schedule for gas alarms;
  • Schedule of inspections and repairs of boilers and auxiliary equipment;
  • Schedule of technical inspection, maintenance and repair of GRU gas equipment, boilers and high-pressure gas pipelines;
  • Schedule of periodic inspections, inspections of the boiler house building and extensions;
  • Chimney monitoring schedule;
  • Schedule of inspections and walkthroughs of the heating network, thermal chambers and wells;
  • Boiler room personnel duty schedule.

Beyond the provision of services for obtaining permission to allow a power plant into operation, we can additionally develop:

  • Regulations on the energy service;
  • Heating network passport;
  • Regulations on production control;
  • Regulations on technical investigation of the causes of incidents;
  • Action plan for localizing and eliminating the consequences of accidents.

Within three months from the date of receipt of the permit, the thermal power plant must be technologically connected to the networks. Otherwise, the permit will need to be reapproved.

The cost of the service for obtaining a permit is 75,000 rubles. Execution time: 30 working days. days.

In what cases is an electrical inspection of a boiler house building carried out?

Considering that the industrial safety inspection of a boiler room is mandatory, the legislator provides an exhaustive list of cases when it must be carried out. These are:

  • The end of the permissible service life of the boiler house building, determined by the design documentation of the hazardous production facility;
  • There is no design documentation for the boiler room, or this documentation does not provide for an acceptable service life;
  • In the event of accidents and incidents that result in damage to the load-bearing structures of the boiler house building;
  • Expiration of the period of permissible operation of the boiler room, which was determined by the conclusion of the industrial safety examination.

Technical devices operating under excess pressure over 0.07 MPa, used by boiler complexes, are subject to industrial safety examination before commissioning, as well as in the following cases:

  • Expiration of service life determined by operational documentation or industrial safety examination;
  • Technical exhaustion due to exceeding the number of load cycles;
  • After 20 years of service, if the service life of the equipment was not provided for in the operational documentation;
  • Carrying out repair and restoration work, as well as manipulations related to modernization and changes in the design of the device.

Instructions for writing a water act for operation

  1. In the first part of the document, its name is written, and its essence is also briefly indicated (in this case, “about the commissioning of equipment”). The line below indicates the locality in which the act is created and the date: day, month (in words), year. Then the composition of the commission that checked the equipment is entered: the positions of the employees are entered, as well as their last names, first names, and patronymics. Here you should also make a reference to the order of the director who appointed the commission (indicate the full name of the enterprise, surname, first name, patronymic, manager, number and date of the order).
  2. The main part is to certify the fact that the equipment has been examined and inspected by the commission. Here you need to enter its name, serial number, technical characteristics, name of the manufacturer, place of manufacture of the equipment, etc. options. The regulations, laws, documents on the basis of which the inspection was carried out and its timing are also recorded here.
  3. The third part of the document contains information about the condition and quality of the equipment being put into operation.
    If it is in good condition, then this should be noted; if it has any defects or malfunctions, then this should also be indicated. If there are any comments, they must be included in the act with all the details. Next, you should add a clause about the commissioning work carried out, as well as that the equipment meets all safety requirements (fire, technical, environmental, industrial). In conclusion, in this part, a separate paragraph needs to summarize that the equipment has passed the test and is ready for use.

The penultimate part of the document contains conclusions on the entire above procedure. If there are no complaints about the equipment, then here you need to enter that the equipment will be put into operation on such and such a date at such and such an address (the address of the enterprises where it will be used is indicated).

If there are complaints, then you should write “not ready for use until identified defects are eliminated.” Next you need to add a warranty clause.

After entering all the information into the act, links to all annexes to it with numbers and dates are included.

The act must be certified by the signatures of the inspection commission. The document can also be certified by a seal, but not necessarily, since since 2016, the presence of a seal for legal entities is not a legal requirement, but is voluntary.

What work does the industrial safety assessment of a boiler house building include?

Examination of a boiler room's hazardous production facility includes a whole range of measures aimed at determining compliance with the industrial safety requirements of the building, equipment and technical devices used by the boiler room.

Depending on the goals and objectives set by the customer, the following types of work are carried out as part of the industrial safety review:

  • Examination of design documentation for conservation or liquidation of the boiler house;
  • Examination of design documentation for technical re-equipment of the boiler house;
  • Examination of technical devices operating under excess pressure;
  • Examination of the industrial safety declaration of the boiler room;
  • Boiler room safety justification.

Boiler house building inspection includes:

  • Study of building structures for compliance with design documentation and regulations in the field of industrial safety;
  • Detection of deficiencies and damage to structural components of the building;
  • Determination of the state of sections and connections of the building elements of the object;
  • Determination of the strength level of building materials and structural elements in comparison with the initial characteristics established by the design documentation;
  • Detection and determination of the degree of rust of metal elements of building structures;
  • Calculation and assessment of the suitability of the building for further operation;
  • Determination of the conditions necessary to extend the service life of the boiler house building.

ACT No. ___ of equipment commissioning

______________ "___" ________ ____ The
commission consisting of:

Chairman:

Members of the commission:

appointed by order (instruction) of the manager No.___ dated “___”_______ _____, having familiarized himself with __________________________________________________________ (name of equipment, brand, type, serial and inventory number)

installed at the address: ________________________________________________, having reviewed the technical documentation provided by _________________________________________________________________________ (name of the developer (manufacturer))

and results of operational tests carried out in accordance with ___________________________________________________________________________ (name and designation of the test program and methodology)

in the period from “___”________ ____ to “___”____________ _____, established that:

1. _______________________________________________________________________ (name of equipment, brand, type, serial and inventory number)

complies with labor protection requirements, taking into account the following comments (if any): __________________________________________________________ ________________________________________________________________________________. 2. The equipment is placed in accordance with design documentation, technological design standards (developed for specific organizations, production facilities and workshops);

3. When placing the equipment, the convenience and safety of its maintenance, the safety of evacuation of workers in the event of emergency situations are ensured, and the impact of harmful and (or) dangerous production factors on other workers is excluded (reduced).

4. Installation, installation (rearrangement) of equipment was carried out in accordance with the design documentation.

5. ______________________________________________________________ passed (name of equipment, brand, type, serial and inventory number)

tests and can be put into operation (or: only after eliminating the deficiencies noted in the List of Comments and Suggestions and preventing commissioning).

Conclusions: 1. ___________________________________________________________________ (name of equipment, brand, type, serial and inventory number)

put into operation at the address: ___________________________________ from “___”_________ ____ (or: after eliminating the deficiencies noted in the List of Comments and Suggestions that impede the commissioning of the equipment). 2. Carry out warranty service in accordance with the technical documentation for the equipment. Applications:

1. Protocol of commissioning works from “___”______ ____, No. ______.

2. List of comments and suggestions from “___”________ ____, No. ______.

Chairman of the commission ________________________________________________________________ (position, personal signature, surname, initials)

Members of the commission ________________________________________________________ (position, personal signature, surname, initials)

Download the document “Equipment Commissioning Certificate”

Stages of carrying out industrial inspection of a boiler room

The algorithm of actions aimed at conducting an industrial safety examination of a boiler house consists of the sequential implementation of certain stages regulated by Federal norms and rules.

  1. Determining the tasks and scope of work to be done. Agreeing on terms and conditions with the customer. Conclusion of an agreement for the provision of services;
  2. Request for documentation necessary for the examination (if the required documents are not available, the issue of their production by an expert organization is decided);
  3. Checking the completeness of the documents and information provided by the customer regarding the object under study. Determining their compliance with industrial safety rules and regulations;
  4. Visual inspection, technical diagnostics and testing at the site itself in relation to the building and the equipment used;
  5. Analysis of data obtained during expert events . Preparation of an industrial safety examination report with substantiated conclusions and recommendations.

Based on the results of the examination, the customer is given the original report and its certified copy. If, during the examination, shortcomings and violations were identified that are unacceptable during the safe operation of the facility, the customer must correct them and eliminate them according to the expert’s recommendations, and then go through the procedure again.

The results of the examination must be registered in the Rostechnadzor register. The operation of the facility or the implementation of work planned by the project is permitted only after receiving a notification about the entry of a positive expert opinion into the register of the Federal Service for Environmental, Technological and Nuclear Supervision.

Letters of gratitude from our clients:

Rating
( 1 rating, average 4 out of 5 )
Did you like the article? Share with friends:
For any suggestions regarding the site: [email protected]
Для любых предложений по сайту: [email protected]